Start Installer 2nd Fix Assessment Visit
NIBE Installer

2nd Fix Assessment Visit

2nd Fix Assessment Visit










Preferred week for assessment to take place? * (mandatory)


Preferred week for assessment to take place?

The heat pump unit is in its final position and piped up * (mandatory)


The heat pump unit is in its final position and piped up


The heat pump controller is in its final position and wired up * (mandatory)


The heat pump controller is in its final position and wired up


At least one unit showing a completed ductwork system to inspect * (mandatory)


At least one unit showing a completed ductwork system to inspect


All heating pipework is fully installed and connected to the unit - Doesn't have to be filled up * (mandatory)


All heating pipework is fully installed and connected to the unit - Doesn't have to be filled up


All heating emitter system is fitted and piped up - Doesn't have to be filled up * (mandatory)


All heating emitter system is fitted and piped up - Doesn't have to be filled up


All hot & cold water pipework is fully installed and connected to the system - Doesn't have to be filled up * (mandatory)


All hot & cold water pipework is fully installed and connected to the system - Doesn't have to be filled up


The hot water cylinder is fully installed and connected to the system - Doesn't have to be filled up * (mandatory)


The hot water cylinder is fully installed and connected to the system - Doesn't have to be filled up


The hot water expansion vessel is fitted & piped up * (mandatory)


The hot water expansion vessel is fitted & piped up


All electrical work is complete and unit is all wired up - Doesn't have to be powered up * (mandatory)


All electrical work is complete and unit is all wired up - Doesn't have to be powered up


Any associated NIBE controls are fitted and wired up - Doesn't have to be powered up * (mandatory)


Any associated NIBE controls are fitted and wired up - Doesn't have to be powered up


T&Cs * (mandatory)


T&Cs

Terms and Conditions

1- Arrangements must be made to ensure access on to the site (i.e. security passes, if required).

2- Should an engineer require an induction course for site access, NIBE must be aware of this prior the attendance.

3- Any prices quoted are normal working hours (08:30 - 17:00) Monday - Friday.

4- Abortive visits will be invoiced to the client against either the original order number for the visit, or against a new order number issued by the customer and received by ourselves prior to the next visit.

5- Lost time that is beyond NIBE's control will be subject to an additional charge of £65 per hour + VAT.

6- Abortive calls, late cancellations (less than 12 hours notice) or installations that are not ready to run when we arrive on site, will be subject to a minimum surcharge of £250 + VAT.

7- If the visit takes place but cannot be completed because of the installation being incomplete or faulty, then an additional charge of £250+VAT will be made for a repeat visit

8- Subsequent requests for further visits will be at NIBE's discretion.